2017 STP Resurfacing Project - Bode Road

Bode Road between Woodlawn Street and Roselle Road was resurfaced this year.  Major items of work included the removal and replacement of the pavement surface layer, curb & gutter and sidewalk repairs, pedestrian safety improvements at the intersections of Washington Boulevard and Grand Canyon Parkway, and on-street bicycle facilities.

Project Update - October 13th

Construction on the Bode Road resurfacing project is substantially complete.  Final inspection and punch list work will be ongoing.  Installation of on-street bicycle facilities / pavement markings remain to be installed.  For more information regarding these markings, known as sharrows, click here and look for the images shown below.

 

Sharrow Image

If you have any questions about this project, please contact the Transportation and Engineering Division by email at roadconstruction@hoffmanestates.org with the words "2017 STP Bode Road" in the subject line, or call us at 847-252-5800.

 

2017 STP Resurfacing Project - Harmon Boulevard

Harmon Boulevard between Bode Road and Golf Road was resurfaced this year.  Major items of work included the removal and replacement of the pavement surface layer, curb & gutter, and sidewalk repairs.

Project Update - October 13th

Construction on the Harmon Boulevard resurfacing project is substantially complete.  Final inspection and punch list work will be ongoing.

If you have any questions about this project, please contact the Transportation and Engineering Division by email at roadconstruction@hoffmanestates.org with the words "2017 STP Harmon Blvd" in the subject line, or call us at 847-252-5800.

 

Bicycle & Pedestrian Project: Shoe Factory Road & I-90 Undercrossing

I-90 Crossing Adjacent to the CN Railroad Right of Way

A project has been in development for several years on a plan to construct a path connecting the Prairie Stone Business Park to the Shoe Factory Road trail.  A portion of the proposed path requires approvals from Canadian National Railway.  Despite ongoing efforts by the Village, agreement with the railroad has not been reached.  As such, the timing of when this work might occur is very uncertain.  The project is a joint effort among the Village, Hoffman Estates Park District, and the Forest Preserve District of Cook County.  The scope is to provide a paved bicycle / pedestrian undercrossing of I-90 along the CN Railroad Right-of-Way to link the Shoe Factory Road path to the Prairie Stone Business Park.  The work would also involve paving the section of earth / gravel path between the CN Railroad Right-of-Way and IL-59.  A connection from the multi-use trail on the north side of Shoe Factory Road to the Prairie Stone Business Park Nature Trail System would be created.  Please click here to view a general concept of the project.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer